PB IRAQ NV
Project description | Year |
---|---|
Construction of new concrete & PVC Cable ducts.
CONTRACT NO: CN 10095 |
2012 |
Basra Governorate
Project description | Year |
---|---|
Supply and installation of 33 KV feeders Towers kind of from Al-Hamar station to Al-Tuba &Nakhila station and brick from Al-Tuba station to Arabs station in Zubair | 2012 |
Construction of new roods with 17 Km length in Al-Dear City in Basra | 2012 |
Supply and install (132/33/11) power transformer with complete section 33/11 | 2012 |
Supply and install underground feeder 33 KVA from old Al-Fyhaa substation to New AL-Fyhaa Substation | 2010 |
Supply and install pipeline 8.5 km in Faw City | 2005 |
Supply and installation water pumps and rehabilitation faw and Saehan water treatment plant | 2006 |
Basra Governorate
Project description | Year |
---|---|
Supply and install and connected the ground feeder 33Kv From Basra center to secondary substation (45 Km) lone | 2008 |
Supply and install and connected (1) Electric Substation (33 /11) with (31.5) MVA Power Transformer with battery charger & (5) circuit breaker | 2007 |
Build school (18 class Rooms) in Al-Zeraji city / Basra | 2006 |
Basra Governorate
Project description | Type |
---|---|
Flow line of development North Rumaila in SGS6, SGS7, SGS8 | Subcontract |
BRT
Project description | Year |
---|---|
Supply and Install underground feeder 33 KVA from Al Dayer to Al Nashwa | 2009 |
Supply and installation four Generator Capacity 500 KW | 2009 |
Asiacell
Project description | Year |
---|---|
Fixing (Telecom network) For Asia cell include green field (40, 45, 60, 70) high with civil and electrical work7 microwave In mid- south Iraq | 2009
2008 2007 |
GRS
Project description | Year |
---|---|
Build typical school (18 class Rooms) with complete furniture | 2008 |
Wassit Government
Project description | Year |
---|---|
Constructions Agriculture builds consist of two floors in Kutt City | 2008 |
MTC AHEER (Zain)
Project description | Year |
---|---|
Fixing (Telecom network) For MTC AHEER (Zain IQ) with all civil and electrical work microwave In mid- south Iraq | 2008
2007 |
Unicef
Project description | Year |
---|---|
Construction typical health center in Basra | 2006 |
Save the Children
Project description | Year |
---|---|
Execute of high &low tension 10 KM lone for building of technical institute / BASRAH | 2006 |
Water treatment compacted units (Ro) and water network 7 Km lone of Abu-AL-Kasib | 2006 |
UNOPS
Project description | Year |
---|---|
Supply and install Ro-Unit 250 m3/day capacity In Ume Qaser City | 2007 |
Construction Delivery word in Al-mijer hospital / Measan Gov | 2006 |
UNDP
Project description | Year |
---|---|
Supply and install Water treatment plan 200 m3/day capacity In Safwan City | 2007 |